The Making of a Studio
1998-12-18 carpenter dave, cutting trusses
1998-12-18 foreman jack climbing the trusses
1998-12-18 lifting trusses for the roof
1998-12-18 lifting trusses for the roof
1998-12-18 roof trusses
1998-12-18 roof work
1998-12-18 working the trusses
1998-12-19 foreman jack
1998-12-20 a view from the back woods
1998-12-20 a view from the front
1998-12-20 inside view of the truss roofing
1998-12-20 inside view of the truss roofing
1998-12-27 framed walls 2
1999-01-15 electric lady wall
1999-01-15 jack sweeping the deck
1999-01-15 tyler, drywalling
1999-01-30 bathroom, airlock, cr from above, copper line to humidifier
1999-01-30 brickP1300004
1999-01-30 brickwork, from the driveway
1999-01-30 brickwork, from the side
1999-01-30 crawl space, suspended ceiling of cr
1999-01-30 ductwork is suspended to reduce noise
1999-01-30 gas furnace drain pan for central humidifier
1999-01-30 gas furnace suspended by springs
1999-01-30 main hvac return & supply
1999-02-01 bricklayer 2
1999-02-01 bricklayer 3
1999-02-01 gotta go under the furnace to get to ductwork
1999-02-01 working the flex duct
1999-02-03 cloud construction
1999-02-08 DaveHileLayingFloor
1999-02-12 bathroom ceiling
1999-02-12 bathroom pump
1999-02-12 closeup of double walls and floors
1999-02-12 control room troughs for wires
1999-02-12 control room troughs to the back racks
1999-02-12 control room window detail
1999-02-12 jack sweeping
1999-02-12 lots of insulation
1999-02-12 studio misc.
1999-02-12 window construction
1999-02-13 control room cloud w hvac flex duct
1999-02-13 jack working the sliding glass doors
1999-02-17 column in front of window
1999-02-17 column into iso booth
1999-02-17 corner trap
1999-02-17 mike from snyder electric
1999-02-17 painter working the soffit trim
1999-02-17 patch around trunks
1999-02-17 skip warrington, studio designer, working on fiberglass sills
1999-02-17 soffit and trap from top
1999-02-17 soffit and window from top
1999-02-17 studio wall
1999-02-19 fluss flooring, cutting bathroom tiles
1999-02-19 front step, just after pouring concrete
1999-02-19 tom working on outside soffit
1999-02-20 rear windows in progress
1999-02-20 soffit lighting
1999-02-20 windows in the back
1999-02-24 corner column slat resonators
1999-02-25 columns2
1999-02-25 columnSingle
1999-02-25 first completed window
1999-02-25 wall trap with lots of R19 insulation
1999-03-04 airlock ceiling
1999-03-04 ceiling cloud
1999-03-04 quadratic diffusors
1999-03-04 snowy outside
1999-03-04 studio ceiling cloud
1999-03-07 omni security box
1999-03-07 trough trap door, control room
1999-03-17 cloud finished
1999-03-17 control room looking upward
1999-03-17 diffusors, deep ones in the corner
1999-03-17 diffusors, right rear corner
1999-03-17 finished cloud in the live room
1999-03-17 finished control room racks
1999-03-17 iso booth corner
1999-03-17 studio corner cabinets and diffusors
1999-03-17 studio corner looking up
1999-03-17 studio door to airlock
1999-03-17 the 400 pound door to the studio
1999-04-03 chris evans wiring the patchbays
1999-04-06 ralph reshaping the yard
1999-04-16 steinway and window
1999-05-23 adding ventilation for hidden monitors
1999-06-23 studio addition, from the front
1999-06-23 studio addition, from the side
1999-06-24 before and after images
1999-08-12 entrance from the outside world
2000-02-22 bobby dengler rewiring the patchbays
2000-03-16 jim hess tuning the steinways
2000-08-13 initial control room layout
2000-08-13 initial layout for 2 steinways
2000-11-21 later we hung fiberglass panels to tame the room
2002-12-21 control room layout in 2002
2002-12-21 many guitars invaded by 2002
2005-12-13 superchunk corner construction in 2005
2005-12-13 superchunk corner construction in 2005
2005-12-24 control room layout in 2005
2005-12-24 many more guitars arrived by 2005